Even with the best route planning, the transport of heavy goods sometimes leads over bridges whose load-bearing capacity is not sufficient for the transport.
But that's no problem for us. With our bridge crossing system, we build our own bridge over the bridge.
Viktor Baumann GmbH & Co. KG
Siemenacker 12
53332 Bornheim
© 2025 Viktor Baumann GmbH & Co. KG